Abpakhsh Sour Gas Compressor Station

Home      Projects      Industrial (Oil, Gas and Petrochemical), metro and railway projects        Abpakhsh Sour Gas Compressor Station
  •  
  •  
  • Execution of Abpakhsh Sour Gas Compressor Station

    Employer: Iran National Gas Company

    Consultant: Rohab and Ghods Niroo Consultant Engineers

    Contractor: Energy Sazeh Aban

     

    Sour Gas (SH2) Compressor Station is located along the sour gas pipeline transport from Asluyeh to Aghajari Oil Well (Nationwide Pipeline Transport no. 5). It is 504 kilometers, beginning in Asaluyeh and passing through Khormuj Compressor Station to Abpakhsh Station and then to Sardasht Station. This project’s operations consisted of infrastructure, pile driving, foundation building, buildings’ metal structure, cable and pipe contraction, construction of service buildings, execution of air conditioning, earthing and etc. The mechanical facilities included installation of turbo-compressors and all auxiliary equipment (air filter, gas cooler, air cooler, air compressor, etc.) and reservoirs.

    The piping included execution of all process gas line pipes to a 60 mm width, all utility lines, testing and pre-launching.

    This project has been delivered.

     

    Project Specifications

    No.

    Description

    Unit

    Approximate Quantity

    1

    Site excavation and transfer

    Cubic meter

    170.000

    2

    Embankment at the site

    Cubic meter

    210.000

    3

    Pile driving at 20 m, 22 m & 27 m and bentonite usage

    Meter length

    12.100

    4

    Reinforcing piles and structures

    Kilogram

    2.850.000

    5

    Moulding

    Square meter

    55.000

    6

    Connecting plate provision & installation

    Kilogram

    28.500

    7

    Provision & execution of concrete with 370 & 385 grades

    Cubic meter

    25.000

    8

    Provision & usage of high-performance lubricant

    Kilogram

    20.000

    9

    Installation of industrial structures like air coolers, compressor, etc.

    Kilogram

    3.000.000

    10

    Sandblasting & painting pipes for sizes up to 56 inches

    Square meter

    15.000

    11

    Pipelining for sizes up to 56 inches

    Inch diameter

    83.000