Execution of Abpakhsh Sour Gas Compressor Station
Employer: Iran National Gas Company
Consultant: Rohab and Ghods Niroo Consultant Engineers
Contractor: Energy Sazeh Aban
Sour Gas (SH2) Compressor Station is located along the sour gas pipeline transport from Asluyeh to Aghajari Oil Well (Nationwide Pipeline Transport no. 5). It is 504 kilometers, beginning in Asaluyeh and passing through Khormuj Compressor Station to Abpakhsh Station and then to Sardasht Station. This project’s operations consisted of infrastructure, pile driving, foundation building, buildings’ metal structure, cable and pipe contraction, construction of service buildings, execution of air conditioning, earthing and etc. The mechanical facilities included installation of turbo-compressors and all auxiliary equipment (air filter, gas cooler, air cooler, air compressor, etc.) and reservoirs.
The piping included execution of all process gas line pipes to a 60 mm width, all utility lines, testing and pre-launching.
This project has been delivered.
Project Specifications
No. |
Description |
Unit |
Approximate Quantity |
1 |
Site excavation and transfer |
Cubic meter |
170.000 |
2 |
Embankment at the site |
Cubic meter |
210.000 |
3 |
Pile driving at 20 m, 22 m & 27 m and bentonite usage |
Meter length |
12.100 |
4 |
Reinforcing piles and structures |
Kilogram |
2.850.000 |
5 |
Moulding |
Square meter |
55.000 |
6 |
Connecting plate provision & installation |
Kilogram |
28.500 |
7 |
Provision & execution of concrete with 370 & 385 grades |
Cubic meter |
25.000 |
8 |
Provision & usage of high-performance lubricant |
Kilogram |
20.000 |
9 |
Installation of industrial structures like air coolers, compressor, etc. |
Kilogram |
3.000.000 |
10 |
Sandblasting & painting pipes for sizes up to 56 inches |
Square meter |
15.000 |
11 |
Pipelining for sizes up to 56 inches |
Inch diameter |
83.000 |