Bandar Abbas Medical Sciences University’s Campus 1

Home      Projects      High-rise office and commercial projects        Bandar Abbas Medical Sciences University’s Campus 1
  •  
  •  
  • Execution of Bandar Abbas Medical Sciences University’s Campus 1

    Employer: Hormozgan province Medical Sciences and Therapeutic Services University

    Consultant: Talash Naghsh Jahan Consultant Engineers

    Contractor: Energy Sazeh Aban

     

    Complete execution of construction operations of Hormozgan Medical Sciences University including construction of library and cafeteria buildings, landscaping and infrastructure facilities which were the campus’s primary priority and also, completing remaining works of Hormozgan Medical Sciences Universiity covering 80000 m2.

    Library building covering 1500 m2 in one floor with metal structure, cafeteria building covering 1200 m2 in one floor with metal structure, landscape covering 70000 m2 with infrastructure facilities and Medical Sciences Faculty in 4 floors with metal structure covering 5600 m2.

    This project has been delivered.