Nasim Neighborhood Center Construction

Home      Projects      Official and Commercial and Religions and Sportive Projects        Nasim Neighborhood Center Construction
  •  
  •  
  • Client: Tehran Municipality, District 22

    Consultant: Pal Mir Consulting Engineers

    Contractor: Energy Sazeh Aban Co.

     

    Project Description:
    Complete execution of all construction works for the Nasim Neighborhood Center with a built-up area of 2,500 square meters.
    The structure consists of a steel frame made of plate girders with a moment-resisting frame system. The roof is constructed using steel decking (Metal Deck). Exterior walls are made with 15 cm thick 3D panels. The heating and cooling system includes a chiller and a central boiler room. The facade features travertine stone and composite panels.

     

    Project Completion:
    This project was completed and delivered in 2015 (Iranian calendar year 1394).