Imam Hasan Mojtaba Mosque

Execution of Imam Hasan Mojtaba Mosque

Employer: District 22 Tehran Municipality

Consultant: Pol Mir Consultant Engineers

Contractor: Energy Sazeh Aban

 

Located in Nasim Neighbourhood Center in District 22 of Tehran Municipality covering 2000 m2.

Strip footing foundation and biaxial moment frame roofs as beam and block were completed. Perimeter walls were composed of pressured bricks and 15 clay wall.

Cooling and heating system: absorption chiller and boiler room

Dome and minaret with metal structure

This project has been delivered.

https://english.energysaze.com/post/5/Imam-Hasan-Mojtaba-Mosque
Home page