Construction of 220-Bed Hospital in Sarab

Home      Projects      Hospital and Health projects        Construction of 220-Bed Hospital in Sarab
  •  
  •  
  • Client: Ministry of Roads and Urban Development, Organization for Implementation of Government and Public Buildings and Facilities
    Consultant: Razigran Consulting Engineers
    Contractor: Energy Sazeh Aban
    Location: East Azerbaijan Province – Sarab City
     
    Project Description:
    Complete execution of all construction and installation works for the 235-bed Sarab hospital, including rough and finish works of the main buildings, all auxiliary buildings, mechanical and electrical installations of the hospital and boiler house, landscaping, and fencing, with a total built-up area of 20,000 m².
    The main building consists of 4 floors, auxiliary buildings cover 1,700 m², and landscaping covers about 19,000 m².
     
    Some technical specifications:
    • The boiler house includes two 250-ton absorption chillers, two steam boilers (14,552 lb/hr), and two 800 KVA generators.
    • The project is equipped with a smart BMS system, CCTV system, addressable fire alarm system, and fire extinguishing system.
     
    This project was delivered in 2017 (1396).