Sarab 220-bed Hospital

Home      Projects      Hospital, religious and sportive projects        Sarab 220-bed Hospital
  •  
  •  
  • Execution of 220-bed Hospital in Sarab

    Employer: Governmental and Public Buildings and Facilities Executive Organization- Ministry of Roads and Urban Development

    Consultant: Razigaran Consultant Engineers

    Contractor: Energy Sazeh Aban

     

    Complete execution of construction and facilities operations including reinforcement, the main building’s joinery, all operations for annex buildings, mechanical and electrical facilities for the hospital, landscaping and enclosure covering 20,000 m2.

    The main building is 4 floors, the annex buildings cover 1700 m2 and also, the landscaping area is 19000 m2. Furthermore, the boiler room includes two 250-ton absorption chillers, two 14,552 lb/hr steam boilers and two 800 kVA generators.

    This project has been delivered.