Shiraz Subway Station No. 5 (Ghadir)

Execution of Shiraz Subway Station No. 5 (Ghadir)

Employer: Shiraz Urban and Suburban Railway Organization

Consultant: Pol Mir Consultant Engineers

Contractor: Energy Sazeh Aban

 

Complete execution of construction operations for Ghadir station as the fifth station of line 1 in Shiraz’s urban and suburban railway at 4 levels covering 9000 m2.

This station has been designed as a deep station and its structure is completely made of concrete. It consists of 4 entrance gates covering 1200 m2 at street level (+14 meters from rail level), ticket hall level covering 3000 m2 (+6.6.5 meters from rail level), platform level covering 1600 m2 (+1.05 meters from rail level) and sub-platform level covering 1600 m2 (-10.1 meters from rail level).

 

This project has been delivered.

https://english.energysaze.com/post/8/Shiraz-Subway-Station-No.-5-Ghadir
Home page